InfoDotInc / archive systemEstablished online record · rebuilding deliberately
InfoDotInc

Technical documents, historic paths, and source-backed reference material.

Archive / FAA Instrument Procedures Handbook / FAA Instrument Procedures Handbook: Chapter 4 — Approaches

Chapter 4 — Approaches — Part 4

Chapter 4 — Approaches — Part 4

FAA-H-8083-16B (2017)

approach altitude of 5,000 feet to be selected in the altitude

pre-selector window. This step is very important because

accurate FD guidance is not available to the PF during a

missed approach if the MDA is left in the window.

Note: See“Maximum Acceptable Descent Rates”under the

heading “Descent Rates and Glide paths for Non-precision

Approaches. ”

Descents

Stabilized Approach

In IMC, you must continuously evaluate instrument

information throughout an approach to properly maneuver

the aircraft or monitor autopilot performance and to decide

on the proper course of action at the decision point (DA,

DH, or MAP). Significant speed and configuration changes

during an approach can seriously degrade situational

awareness and complicate the decision of the proper action

to take at the decision point. The swept wing handling

characteristics at low airspeeds and slow engine response

of many turbojets further complicate pilot tasks during

approach and landing operations. You must begin to form

a decision concerning the probable success of an approach

before reaching the decision point. Your decision-making

process requires you to be able to determine displacements

from the course or glideslope/glidepath centerline, to

mentally project the aircraft’s three-dimensional flight path

by referring to flight instruments, and then apply control

inputs as necessary to achieve and maintain the desired

approach path. This process is simplified by maintaining a

constant approach speed, descent rate, vertical flight path,

and configuration during the final stages of an approach.

This is referred to as the stabilized approach concept.

A stabilized approach is essential for safe turbojet operations

and commercial turbojet operators must establish and

use procedures that result in stabilized approaches. A

stabilized approach is also strongly recommended for

propeller-driven airplanes and helicopters. You should limit

configuration changes at low altitudes to those changes

that can be easily accommodated without adversely

affecting your workload. For turbojets, the aircraft must

be in an approved configuration for landing or circling,

if appropriate, with the engines spooled up, and on the

correct speed and flight path with a descent rate of less

than 1,000 fpm before descending below the following

minimum stabilized approach heights:

• For all straight-in instrument approaches, to include

contact approaches in IFR weather conditions, the

approach must be stabilized before descending

below 1,000 feet above the airport or TDZE.

• For visual approaches and straight-in instrument

approaches in VFR weather conditions, the approach

must be stabilized before descending below 500 feet

above the airport elevation.

• For the final segment of a circling approach

maneuver, the approach must be stabilized 500 feet

above the airport elevation or at the MDA, whichever

is lower. These conditions must be maintained

throughout the approach until touchdown for the

approach to be considered a stabilized approach.

This also helps you to recognize a wind shear

situation should abnormal indications exist during

the approach.

Descent Rates and Glidepaths for Nonprecision

Approaches

Maximum Acceptable Descent Rates

Operational experience and research have shown that a

descent rate of greater than approximately 1,000 fpm is

unacceptable during the final stages of an approach (below

1,000 feet AGL). This is due to a human perceptual limitation

that is independent of the type of airplane or helicopter.

Therefore, the operational practices and techniques must

ensure that descent rates greater than 1,000 fpm are not

permitted in either the instrument or visual portions of an

approach and landing operation.

For short runways, arriving at the MDA at the MAP when

the MAP is located at the threshold may require a missed

approach for some aircraft. For non-precision approaches,

a descent rate should be used that ensures the aircraft

reaches the MDA at a distance from the threshold that

allows landing in the TDZ. On many IAPs, this distance is

annotated by a VDP . If no VDP is annotated, calculate a

normal descent point to the TDZ. To determine the required

rate of descent, subtract the TDZE from the FAF altitude

and divide this by the time inbound. For example, if the

FAF altitude is 2,000 feet MSL, the TDZE is 400 feet MSL

and the time inbound is two minutes, an 800 fpm rate of

descent should be used.

To verify the aircraft is on an approximate three degree

glidepath, use a calculation of 300 feet to 1 NM. The

glidepath height above TDZE is calculated by multiplying

the NM distance from the threshold by 300. For example,

at 10 NM the aircraft should be 3,000 feet above the TDZE,

at 5 NM the aircraft should be 1,500 feet above the TDZE,

at 2 NM the aircraft should be 600 feet above the TDZE, and

at 1.5 NM the aircraft should be 450 feet above the TDZE

until a safe landing can be made. Using the example in the

previous text, the aircraft should arrive at the MDA (800

Figure 4-20. Example approaches using autopilot.

feet MSL) approximately 1.3 NM from the threshold and in

a position to land within the TDZ. Techniques for deriving a

300-to-1 glide path include using DME, distance advisories

provided by radar-equipped control towers, RNAV, GPS,

dead reckoning, and pilotage when familiar features on the

approach course are visible. The runway threshold should

be crossed at a nominal height of 50 feet above the TDZE.

Transition to a Visual Approach

The transition from instrument flight to visual flight during

an instrument approach can be very challenging, especially

during low visibility operations. Aircrews should use caution

when transitioning to a visual approach at times of shallow

fog. Adequate visibility may not exist to allow flaring of

the aircraft. Aircrews must always be prepared to execute

a missed approach/go-around. Additionally, single-pilot

operations make the transition even more challenging.

Approaches with vertical guidance add to the safety of

the transition to visual because the approach is already

stabilized upon visually acquiring the required references

for the runway. 100 to 200 feet prior to reaching the DA,

DH, or MDA, most of the PM’s attention should be outside

of the aircraft in order to visually acquire at least one visual

reference for the runway, as required by the regulations.

The PF should stay focused on the instruments until the

PM calls out any visual aids that can be seen, or states

“runway in sight. ”The PF should then begin the transition

to visual flight. It is common practice for the PM to call out

the V/S during the transition to confirm to the PF that the

instruments are being monitored, thus allowing more of

the PF’s attention to be focused on the visual portion of the

approach and landing. Any deviations from the stabilized

approach criteria should also be announced by the PM.

Single-pilot operations can be much more challenging

because the pilot must continue to fly by the instruments

while attempting to acquire a visual reference for the

runway. While it is important for both pilots of a two-pilot

aircraft to divide their attention between the instruments

and visual references, it is even more critical for the

single- pilot operation. The flight visibility must also be

at least the visibility minimum stated on the instrument

approach chart, or as required by regulations. CAT II and III

approaches have specific requirements that may differ from

CAT I precision or non-precision approach requirements

regarding transition to visual and landing. This information

can be found in the operator’s OpSpecs or FOM.

The visibility published on an approach chart is dependent

on many variables, including the height above touchdown

for straight-in approaches or height above airport elevation

for circling approaches. Other factors include the approach

light system coverage, and type of approach procedure,

Runway

Runway

200 feet Not to scale

20:1

34:1

10,000 feet

Figure 4-21. Determination of visibility minimums.

such as precision, non-precision, circling or straight-in.

Another factor determining the minimum visibility is the

penetration of the 34:1 and 20:1 surfaces. These surfaces

are inclined planes that begin 200 feet out from the runway

and extend outward to the DA point (for approaches with

vertical guidance), the VDP location (for non-precision

approaches) and 10,000 feet for an evaluation to a circling

runway. If there is a penetration of the 34:1 surface, the

published visibility can be no lower than three-fourths SM.

If there is penetration of the 20:1 surface, the published

visibility can be no lower than 1 SM with a note prohibiting

approaches to the affected runway at night (both straight-

in and circling). [Figure 4-21 ] Circling may be permitted

at night if penetrating obstacles are marked and lighted.

If the penetrating obstacles are not marked and lighted,

a note is published that night circling is “Not Authorized. ”

Pilots should be aware of these penetrating obstacles

when entering the visual and/or circling segments of an

approach and take adequate precautions to avoid them.

For RNAV approaches only, the presence of a grey shaded

line from the MDA to the runway symbol in the profile view

is an indication that the visual segment below the MDA is

clear of obstructions on the 34:1 slope. Absence of the gray

shaded area indicates the 34:1 OCS is not free of obstructions.

[Figure 4-22]

Missed Approach

Many reasons exist for executing a missed approach. The

primary reasons, of course, are that the required flight

visibility prescribed in the IAP being used does not exist

when natural vision is used under 14 CFR Part 91, § 91.175c,

the required enhanced flight visibility is less than that

prescribed in the IAP when an EFVS is used under 14 CFR

Part 91, § 91.176, or the required visual references for the

runway cannot be seen upon arrival at the DA, DH, or

MAP . In addition, according to 14 CFR Part 91, the aircraft

must continuously be in a position from which a descent

to a landing on the intended runway can be made at a

NOT FOR NAVIGATION

EC 2010 to 13 JAN 2011

3 JASE-1, 16 DEC 2010 to 1

Figure 4-22. RNAV approach Fort Campbell, Kentucky.

normal rate of descent using normal maneuvers, and for

operations conducted under Part 121 or 135, unless that

descent rate allows touchdown to occur within the TDZ of

the runway of intended landing. CAT II and III approaches

call for different visibility requirements as prescribed by

the FAA Administrator.

Prior to initiating an instrument approach procedure,

the pilot should assess the actions to be taken in the

event of a balked (rejected) landing beyond the missed

approach point or below the MDA or DA (H) considering

the anticipated weather conditions and available aircraft

performance. 14 CFR 91.175(e) authorizes the pilot to

fly an appropriate missed approach procedure that

ensures obstruction clearance, but it does not necessarily

consider separation from other air traffic. The pilot must

consider other factors such as the aircraft’s geographical

location with respect to the prescribed missed approach

point, direction of flight, and/ or the minimum turning

altitudes in the prescribed missed approach procedure.

The pilot must also consider aircraft performance, visual

climb restrictions, charted obstacles, published obstacle

departure procedure, takeoff visual climb requirements

as expressed by nonstandard takeoff minima, other traffic

expected to be in the vicinity, or other factors not

specifically expressed by the approach procedures.

A clearance for an instrument approach procedure

includes a clearance to fly the published missed

approach procedure, unless otherwise instructed

by ATC. Once descent below the DA, DH, or MDA is

begun, a missed approach must be executed if the

required visibility is lost or the runway environment is

no longer visible, unless the loss of sight of the runway

is a result of normal banking of the aircraft during a

circling approach. A MAP is also required upon the

execution of a rejected landing for any reason, such

as men and equipment or animals on the runway, or

if the approach becomes unstabilized and a normal

landing cannot be performed. After the MAP in the

visual segment of a non-precision approach, there may

be hazards when executing a missed approach below

the MDA. The published missed approach procedure

provides obstacle clearance only when the missed

approach is conducted on the missed approach

segment from or above the missed approach point,

and assumes a climb rate of 200 ft/NM or higher, as

published. If the aircraft initiates a missed approach

at a point other than the missed approach point, from

below MDA or DA (H), or on a circling approach, obstacle

clearance is not provided by following the published

missed approach procedure, nor is separation assured from

other air traffic in the vicinity.

The missed approach climb is normally executed at the

MAP . If such a climb is initiated at a higher altitude prior

to the MAP , pilots must be aware of any published climb-

altitude limitations, which must be accounted for when

commencing an early climb. Figure 4-23 gives an example

of an altitude restriction that would prevent a climb

between the FAF and MAP . In this situation, the Orlando

Executive ILS or LOC RWY 7 approach altitude is restricted

at the BUVAY 3 DME fix to prevent aircraft from penetrating

the overlying protected airspace for approach routes into

Orlando International Airport. If a missed approach is

initiated before reaching BUVAY, a pilot may be required

to continue descent to 1,200 feet before proceeding

to the MAP and executing the missed approach climb

instructions. In addition to the missed approach notes

on the chart, the Pilot Briefing Information icons in the

profile view indicate the initial vertical and lateral missed

approach guidance.

The missed approach course begins at the MAP and

continues until the aircraft has reached the designated

fix and a holding pattern has been entered. [Figure 4-24]

In these circumstances, ATC normally issues further

instructions before the aircraft reaches the final fix of

the missed approach course. It is also common for the

designated fix to be an IAF so that another approach

attempt can be made without having to fly from the

holding fix to an IAF.

In the event a balked (rejected) landing occurs at a position

other than the published missed approach point, the

pilot should contact ATC as soon as possible to obtain an

amended clearance. If unable to contact ATC for any reason,

the pilot should attempt to re−intercept a published

segment of the missed approach and comply with route

and altitude instructions. If unable to contact ATC, and

in the pilot’s judgment it is no longer appropriate to fly

the published missed approach procedure, then consider

either maintaining visual conditions (if possible) and

reattempt a landing, or a circle−climb over the airport.

Should a missed approach become necessary when

operating to an airport that is not served by an operating

control tower, continuous contact with an air traffic facility

may not be possible. In this case, the pilot should execute

the appropriate go−around/missed approach procedure

without delay and contact ATC when able to do so.

As shown in Figure 4-25 , there are many different ways

that the MAP can be depicted, depending on the type

of approach. On all approach charts, it is depicted in the

profile and plan views by the end of the solid course

line and the beginning of the dotted missed approach

course line for the top-line/ lowest published minima. For

a precision approach, the MAP is the point at which the

aircraft reaches the DA or DH while on the glideslope/

glidepath. MAPs on non-precision approaches can be

determined in many different ways. If the primary NAVAID

is on the airport, and either a VOR or NDB approach is

being executed, the MAP is normally the point at which

the aircraft passes the NAVAID.

On some non-precision approaches, the MAP is given as

a fixed distance with an associated time from the FAF to

the MAP based on the groundspeed of the aircraft. A table

on the lower right or left hand side of the approach chart

shows the distance in NM from the FAF to the MAP and

the time it takes at specific groundspeeds, given in 30

knot increments. Pilots must determine the approximate

groundspeed and time based on the approach speed and

true airspeed of their aircraft and the current winds along

the final approach course. A clock or stopwatch should be

started at the FAF of an approach requiring this method.

Many non-precision approaches designate a specific fix

as the MAP . These can be identified by a course (LOC or

VOR) and DME, a cross radial from a VOR, or an RNAV (GPS)

waypoint.

Obstacles or terrain in the missed approach segment

may require a steeper climb gradient than the standard

200 ft/NM. If a steeper climb gradient is required, a note

is published on the approach chart plan view with the

penetration description and examples of the required

FPM rate of climb for a given groundspeed (future

charting uses climb gradient). An alternative is normally

charted that allows using the standard climb gradient.

[Figure 4-25] In this example, if the missed approach climb

requirements cannot be met for the Burbank ILS RWY 8

chart, the alternative is to use the LOC RWY 8 that is charted

separately. The LOC RWY 8, S-8 procedure has a MDA that

is 400 feet higher than the ILS RWY 8, S-LOC 8 MDA and

meets the standard climb gradient requirement over the

terrain. For some approaches a new charting standard is

requiring two sets of minimums to be published when

a climb gradient greater than 200 ft/NM is required. The

first set of minimums is the lower of the two, requiring a

climb gradient greater than 200 ft/NM. The second set of

minimums is higher, but doesn’t require a climb gradient.

Shown in Figure 4-26, Barstow-Daggett (KDAG) RNAV

(GPS) RWY 26 is an example where there are two LPV lines

of minimums.

Example Approach Briefing

During an instrument approach briefing, the name of the

airport and the specific approach procedure should be

identified to allow other crewmembers the opportunity

to cross-reference the chart being used for the brief. This

ensures that pilots intending to conduct an instrument

approach have collectively reviewed and verified the

information pertinent to the approach. Figure 4-27

gives an example of the items to be briefed and their

sequence. Although the following example is based on

multi-crew aircraft, the process is also applicable to single-

pilot operations. A complete instrument approach and

operational briefing example follows.

The approach briefing begins with a general discussion of

the ATIS information, weather, terrain, NOTAMs, approaches

in use, runway conditions, performance considerations,

expected route to the final approach course, and the

traffic situation. As the discussion progresses, the items

and format of the briefing become more specific. The

briefing can also be used as a checklist to ensure that

all items have been set up correctly. Most pilots verbally

brief the specific MAP so that it is fresh in their minds and

there is no confusion as to who is doing what during a

missed approach. Also, it is a very good idea to brief the

published missed approach even if the tower is most likely

to give you alternate instructions in the event of a missed

approach. A typical approach briefing might sound like

the following example for a flight inbound to the Monroe

Regional Airport (KMLU):

ATIS: “Monroe Regional Airport Information Bravo, time

2253 Zulu, wind 360 at 10, visibility 1 mile, mist, ceiling 300

overcast, temperature 4, dew point 3, altimeter 29.73, ILS

Runway 4 approach in use, landing and departing Runway

4, advise on initial contact that you have information Bravo. ”

PF: “We’re planning an ILS approach to Runway 4 at Monroe

Regional Airport, page 270, effective date 22 Sep 11 to

20 Oct 11. Localizer frequency is 109.5, SABAR Locator

Outer Marker is 392, Monroe VOR is 117.2, final approach

course is 042º. We’ll cross SABAR at 1,483 feet barometric,

decision altitude is 278 feet barometric, touchdown zone

elevation is 78 feet with an airport elevation of 79 feet. MAP

is climb to 2,000 feet, then climbing right turn to 3,000

feet direct Monroe VOR and hold. The MSA is 2,200 feet

to the north and along our missed approach course, and

3,100 feet to the south along the final approach course.

ADF or DME is required for the approach and the airport

has pilot controlled lighting when the tower is closed,

which does not apply to this approach. The runway has a

medium intensity approach lighting system with runway

alignment indicator lights and a precision approach path

indicator (PAPI). We need a half- mile visibility so with one

mile we should be fine. Runway length is 7,507 feet. I’m

planning a flaps 30 approach, auto- brakes 2, left turn on

Alpha or Charlie 1 then Alpha, Golf to the ramp. With a

left crosswind, the runway should be slightly to the right.

I’ll use the autopilot until we break out and, after landing,

I’ll slow the aircraft straight ahead until you say you have

control and I’ll contact ground once we are clear of the

runway. In the case of a missed approach, I’ll press TOGA

(Take-off/Go-Around button used on some turbojets), call

‘go-around thrust, flaps 15, positive climb, gear up, set me

up, ’ climb straight ahead to 2,000 feet then climbing right

turn to 3,000 feet toward Monroe or we’ll follow the tower’s

instructions. Any questions?”

PM: “I’ll back up the auto-speedbrakes. Other than that, I

don’t have any questions. ”

Instrument Approach Procedure Segments

An instrument approach may be divided into as many as

four approach segments: initial, intermediate, final, and

missed approach. Additionally, feeder routes provide

a transition from the en route structure to the IAF. FAA

Order 8260.3 criteria provides obstacle clearance for each

segment of an approach procedure as shown in Figure 4-28.

Feeder Routes

By definition, a feeder route is a route depicted on IAP

charts to designate routes for aircraft to proceed from the

en route structure to the IAF. [Figure 4-29 ] Feeder routes,

also referred to as approach transitions, technically are

not considered approach segments but are an integral

part of many IAPs. Although an approach procedure may

have several feeder routes, pilots normally choose the one

closest to the en route arrival point. When the IAF is part of

the en route structure, there may be no need to designate

additional routes for aircraft to proceed to the IAF.

When a feeder route is designated, the chart provides

the course or bearing to be flown, the distance, and the

minimum altitude. En route airway obstacle clearance

criteria apply to feeder routes, providing 1,000 feet of

obstacle clearance (2,000 feet in mountainous areas).

Terminal Routes

In cases where the IAF is part of the en route structure

and feeder routes are not required, a transition or terminal

route is still needed for aircraft to proceed from the IAF to

the intermediate fix (IF). These routes are initial approach

segments because they begin at the IAF. Like feeder routes,

they are depicted with course, minimum altitude, and

distance to the IF. Essentially, these routes accomplish the

same thing as feeder routes but they originate at an IAF,

whereas feeder routes terminate at an IAF. [Figure 4-30 ]

DME Arcs

DME arcs also provide transitions to the approach course,

but DME arcs are actually approach segments while feeder

routes, by definition, are not. When established on a DME

arc, the aircraft has departed the en route phase and has

begun the approach and is maneuvering to enter an

intermediate or final segment of the approach. DME arcs

may also be used as an intermediate or a final segment,

although they are extremely rare as final approach

segments.

An arc may join a course at or before the IF. When joining

a course at or before the IF, the angle of intersection of the

arc and the course is designed so it does not exceed 120°.

When the angle exceeds 90°, a radial that provides at least 2

NM of lead will be identified to assist in leading the turn on

to the intermediate course. DME arcs are predicated on DME

collocated with a facility providing omnidirectional course

information, such as a VOR. A DME arc cannot be based on

an ILS or LOC DME source because omnidirectional course

information is not provided.

The ROC along the arc depends on the approach segment.

For an initial approach segment, a ROC of 1,000 feet is

required in the primary area, which extends to 4 NM on

either side of the arc. For an intermediate segment primary

area, the ROC is 500 feet. The initial and intermediate

segment secondary areas extend 2 NM from the primary

boundary area edge. The ROC starts at the primary area

boundary edge at 500 feet and tapers to zero feet at the

secondary area outer edge. [Figure 4-31 ]

Course Reversal

Some approach procedures do not permit straight-in

approaches unless pilots are being radar vectored. In these

situations, pilots are required to complete a procedure turn

(PT) or other course reversal, generally within 10 NM of the

PT fix, to establish the aircraft inbound on the intermediate

or final approach segment.

If Category E airplanes are using the PT or there is a descent

gradient problem, the PT distance available can be as much

as 15 NM. During a procedure turn, a maximum speed of

200 knots indicated airspeed (KIAS) should be observed

from first crossing the course reversal IAF through the

procedure turn maneuver to ensure containment within

the obstruction clearance area. Unless a holding pattern

or teardrop procedure is published, the point where pilots

begin the turn and the type and rate of turn are optional.

If above the procedure turn minimum altitude, pilots may

begin descent as soon as they cross the IAF outbound.

A procedure turn is the maneuver prescribed to perform

a course reversal to establish the aircraft inbound on an

intermediate or final approach course. The procedure turn

or hold-in-lieu-of procedure turn is a required maneuver

when it is depicted on the approach chart. However, the

procedure turn or the hold-in-lieu-of PT is not permitted

when the symbol “No PT” is depicted on the initial segment

being flown, when a RADAR VECTOR to the final approach

course is provided, or when conducting a timed approach

from a holding fix.

The altitude prescribed for the procedure turn is a

minimum altitude until the aircraft is established on the

inbound course. The maneuver must be completed within

the distance specified in the profile view. This distance is

usually 10 miles. This may be reduced to five miles where

only Category A or helicopter aircraft are operated. This

distance may be increased to as much as 15 miles to

accommodate high performance aircraft.

The pilot may elect to use the procedure turn or hold-in­

lieu-of PT when it is not required by the procedure, but

must first receive an amended clearance from ATC. When

ATC is radar vectoring to the final approach course, or to

the intermediate fix as may occur with RNAV standard

instrument approach procedures, ATC may specify in

the approach clearance “CLEARED STRAIGHT-IN (type)

APPROACH” to ensure that the pilot understands that the

procedure turn or hold-in-lieu-of PT is not to be flown. If

the pilot is uncertain whether ATC intends for a procedure

turn or a straight-in approach to be flown, the pilot will

immediately request clarification from ATC.

On U.S. Government charts, a barbed arrow indicates the

maneuvering side of the outbound course on which the

procedure turn is made. Headings are provided for course

reversal using the 45° type procedure turn. However, the

point at which the turn may be commenced and the type

and rate of turn is left to the discretion of the pilot (limited

by the charted remain within XX NM distance). Some of the

options are the 45° procedure turn, the racetrack pattern,

the teardrop procedure turn, or the 80° procedure turn, or

the 80° 260° course reversal. Racetrack entries should

be conducted on the maneuvering side where the majority

of protected airspace resides. If an entry places the pilot

on the non-maneuvering side of the PT, correction to

intercept the outbound course ensures remaining within

protected airspace.

Some procedure turns are specified by procedural track.

These turns must be flown exactly as depicted. These

Figure 4-23. Orlando Executive Airport, Orlando, Florida, ILS RWY 7.

NOT FOR NAVIGATION

SC-2, 18 NOV 2010 to 16 DEC 2010

SC-2, 18 NOV 2010 to 16 DEC 2010

Figure 4-24 Missed approach procedures for Dallas-Fort Worth International (DFW)4

NOT FOR NAVIGATION

SW-3, 18 NOV 2010 to 16 DEC

, 18 NOV 2010 to 16 DEC 2010

010 to 16 DEC 201

W-3, 18 NOV 2010 t

This NOTE on the ILS RWY 8 chart for the missed approach climb requirement

applies to all lines of minimums. If you are unable to make the climb rate/gradient,

you must use the higher minimums on the separately published LOC RWY 8

chart that meet the standard climb gradient of 200 ft/NM.

SW-3

Figure 4-25. Missed approach point depiction and steeper than standard climb gradient requirements.

requirements are necessary to stay within the protected The primary and secondary areas determine obstacle

airspace and maintain adequate obstacle clearance. [Figure clearance in both the entry and maneuvering zones. The

4-32] A minimum of 1,000 feet of obstacle clearance is use of entry and maneuvering zones provides further relief

provided in the procedure turn primary area. [Figure 4-33] from obstacles. The entry zone is established to control the

In the secondary area, 500 feet of obstacle clearance is obstacle clearance prior to proceeding outbound from the

provided at the inner edge, tapering uniformly to 0 feet procedure turn fix. The maneuvering zone is established

at the outer edge. to control obstacle clearance after proceeding outbound

from the procedure turn fix.

Figure 4-26. Two sets of minimums required when a climb gradient greater than 200 ft/NM is required.

Figure 4-27. Example of approach chart briefing sequence.

Original source PDFPublished from pages 177–188 of the recorded source chapter.
Open source PDF ↗