Change 1 (December 2015)
Change 1 (December 2015)
Change 1 (December 2015)
Change 1 (December 2015)
Change 1 (December 2015)
A. Introduction
1. FAA rules and regulations
2. Part 105, 91, 65, and basic facilities to practice rigging, (packing table, inspection, drying area)
3. Responsibility as a licensed rigger, privilages, and rating limitations
4. Paperwork, FAA, logbook, datacard, ADs, service bulletins, (binder with all ADs and SBs)
5. Filling out inspection log book, filling out data cards
B. Rigging Techniques and Tools (VIDEO)
1. Modem rigging technics and methods
2. Packing tapes (Square reserves)
3. Vector
4. Racer
5. Javelin
6. Talon
7. Vector tandem, strong, racer
C. Round Canopy
1. Construction and materials
2. Aerodynamics
3. Inspection procedures, (bridle attaching methods)
4. Line continuity (two and four riser systems) (round to riser assembly)
5. Canopy layout (on packing table)
6. Canopy sections, gore numbers, panel designations.
7. Data panel information
8. Alterations or repairs listed on data panel (is it approved? where do we look?)
9. Diapers, full stow, two stow, vertical stow, etc.
10. Flaking the canopy for packing
11. Diaper and line stowing
12. Acid test and inspection
D. Square Canopy
1. Construction and materials
2. Aerodynamics
3. Inspection procedures, (layout on carpet) (hanging by tail)
4. Line continuity (cascaded and continuous lines) (assembly to risers)
5. Canopy sections (nose, tail, upper and lower skins, ribs, load bearing ribs, crossports)
6. Data panel infonnation
7. Steering toggles (types installation sand stowing methods)
8, Deployment systems (freebags, etc.) (inspection of these systems)
9. Packing methods (side pack, stack pack, pro pack, hanging pro pack)
10. Folding canopy (to place indeployment bag) (freebag types, vector, racer, molar, etc.)
11. Line stowing (methods and tools)
EXAMPLE OUTLINE FOR SENIOR RIGGER TRAINING,
CLASSES, DEMONSTRATIONS AND PROJECTS.
Change 1 (December 2015)
E. Harness and Containers
1. Construction and materials
2. Hardware (types, inspection, values of types, ADs or SBs, proper installation)
3. Gromets (types, inspection)
4. Snaps (types, inspection)
5. Cable housings (types, inspection)
6. Attachment links (types, inspection, main and reserve)
7. Pilot chute (types, inspection, both main and reserve, including retract and collapsible)
8. Hand tacking (materials, methods, inspections)
9. Ripcords and release handles (types, materials, inspection procedures)
10. Pins and cones (types, inspection)
11. Harness and container inspection (as a unit)
F. Sewing Machines
1. Manufactures and types (uses of different types) (straight locking, zig zag, bar tack, harness)
2. Sewing machine components (table, head, motor, clutch/brake, bobbin winder, etc.)
3. Threading the machine (needle and bobbin) (thread types and values)
4. Basic operating of machine (foot, knee, hands, and effects, sew, brake, lift foot, set needle, etc.)
5. Types of sewing stitches (301-304-308)
G. Tools (Demonstrations and Applications for all Types)
1. Pull up cords
2. Packing weights
3. Line seperator (round/square)
4. Through the bag cord with friction lock
5. Molarstrap
6. Rifle cleaning rod
7. Velcro covers
8. Temporarypins
9. Knee plate
10. T-Bar
11. Packing paddles (long/short)
12. Bodkins
13. Seam ripper
14. Scissors (nippers)
15. Finger trap fids
16. Positive closing device
17. Hand sewing needles
18. Razor knife
19. Tailoring pencils (correct type dixon)
20. Seal press
21. L-Bar seperator
22. Weight scale (pull test)
23. Pull test clamps
24. Hot knife
25. Gromet hole cutters
26. Gromet sets
27. Snap setting tools
28. Hot glue gun
Change 1 (December 2015)
Change 1 (December 2015)
J . Demonstrations (continued)
21. Tangled round
22. Tangled square
23. Complete inspection (round reserve)
24. Complete inspection (square reserve)
25. Assembly complete (round)
26. Assembly complete (square)
27. Hand sewing and tacking (comfort pads, connector links, cones, reserve cable housing, eyelets)
28. Needle fold (reserve bridles)
29. Installing toggles (main and reserve)
30. Installing gromets and snaps
31. Finger trapping suspension line
32. 4-line release systems
33. Nylon mesh acid test
34. Pull test (description warp and fill thread to selvege edge)
35. Pull test (using scale check pull tension on reserve ripcord)
36. Installing a 6-inch patch in F-111
K. Projects
1. Install to airworthy standards around reserve
2. Install to airworthy standards a square reserve
3. Round canopy inspection locate and verify defects
4. Square canopy inspection locate and verify defects
S. Square reserve side pack
6. Square reserve pro pack
7. Harness and container inspection locate and verify defects
8. Pack B-12
9. Pack NB-6
10. Pack round reserve with 2 stow diaper
11. Pack round reserve with vertical full stow diaper
12. Pack round reserve with full stow diaper
13. Pack round reserve with vertical full stow diaper parallelto bottom of pack tray
14. Pack square reserve in Vector-type freebag (using through bag cord)
15. Pack square reserve in Javelin-type free bag (molar)
16. Untangle round reserve using proper technique
17. Untangle square reserve using proper technique
18. Demonstrate knowledge of 4-line release systems
19. Hand sew ripcord housing, tack comfort pad, Hand sew cone and eyelet
20. Tie knots, overhand, square, clove hitch, double half hitch, slip loop, bowline, surgeon’s & locking.
21. Install proper seal on closing pin
22. Perform proper needle fold
23. Machine sewing 1 (build shot bags using templates and perform sewingpractise drills)
24. Machine sewing 2 (install a six inch patch to exceptable and airworthy standards)
25. Using proper tools (cut hole and set gromets in parapack and install snaps)
26. Install steering toggles using recognizedmethods
27. Finger-trap suspension line to a finished length by calculating shrinkage of traped area
28. Perform dryrun reserve inspection and repack to airworthy standards meeting all FAA requirements
29. Locate correct information for compatability, assembly and inspection of a sport rig and reserve
30. Perform at least 20 complete inspections and repacks to standards of back type reserves
Change 1 (December 2015)
A. Introduction
1. Federal Aviation Administration (FAA) regulations and rating privileges
2. Review Title 14 Code of Federal Regulations (CFR) parts 105, 91, detail part 65 required facilities, equipment, tools,
materials, record keeping, repair testing
3. Mil-Spec materials and values
4. Technical Standard Order (TSO) standards and who creates them. Current standards, categories, and limitations and who
maintains them
5. Skills, responsibilities, and ethics of a master parachute rigger
6. Record keeping
7. Alterations, manufactures, FAA authorization process, records and documentation
B. The Parachute Loft
1. Facilities
2. Work areas, round canopies, square canopies, suspended, table
3. Material storage, and support, conditions for material quality
4. Inspection areas and lighting
5. Hand tools, types, uses, control, maintenance
6. Sewing machines
7. Parachute equipment storage, short and long term
8. Project tables, layout and cutting
C. Harness & Container Systems
1. Reserve system deployment types, (internal pilot chute) (external pilot chute)
2. Harness types, (standard harness) (partial articulated harness) (fully articulate harness)
3. Hardware, current manufactures, (standard cadmium plated) (stainless steel) (rapide links, “galvanized” “stainless”)
(Slinks – Manufactured by Performance Design and Precision Aerodynamics)
4. 3-ring release systems, ring sizes, maintenance, riser sizes, lengths, construction
5. Reserve ripcord systems, types, housings, ripcords
6. Main canopy deployment systems, ripcord, throwout, pullout, bottom of container (BOC), PUD system
7. Freebag systems, deployment bag types and cuts, line stow types, bridles and bridle assists, reserve pilotchute types
8. Main canopy release systems, housing types, duel action systems (student equipment)
D. Square Parachute Systems
1. Modern construction
2. Materials
3. Airfoil types (elliptical, semi elliptical, tapered, multi cell)
4. Cell construction types (I-beam, interlocking T-beam, half cell, spanwise)
5. Suspension line types and line attachments types (Spectra, Kevlar, Vectran, HMA, Dacron)
6. Canopy suspension line trim
7. Modern canopy repair methods and limitations (Chapter 7 FAA Parachute Rigger Handbook) (RD Raghanti repair method)
8. Square canopy design and flight definitions
(A) Airfoil section area
(B) Angle of attack
(C) Angle of trim
(D) Angle of incidence
(E) Aspect ratio
(F) Cascade line
(G) Cell
(H) Chord
(I) Control line
(J) Control line deflection
Example Training Syllabus for Master Rigger Training, Classes,
Demonstrations, and Projects
Change 1 (December 2015)
(K) Construction chordwise
(L) Construction full-cell chordwise
(M) I-beam
(N) Interlocking T-beam
(O) Half-cell chordwise
(P) Construction spanwise
(Q) Cross ports
(R) Deployment brakes
(S) Flares, suspension line attachments
(T) Full flight settings
(U) Glide path (flightpath) angle
(V) Pilot chute controlled reefing
(W) Planform
(X) Planform area
(Y) Plumbline
(Z) Projected area
(AA) Quarter chord area
(BB) Reference line
(CC) Ribs
(DD) Riser specs
(EE) Slider
(FF) Slider stops
(GG) Stabilizer panels
(HH) Span
(II) Suspension lines (A) (B) (C) (D)
(JJ) Suspension line length
(KK) Trim line
(LL) Toggles control
(MM) Final trim measurements
E. Authorized/Certificated Parachute Components and Compatibility
1. Manufactures inspection and packing instructions
2. Approved data
3. Acceptable data
4. Methods to confirm compatibility
F. Automatic Activation Devises
1. Types
2. Service requirements (life, battery service, trouble codes, inspections)
3. Control and calibration
4. Installation
5. Service during FAA 180-day inspection cycle
6. Compatibility to TSOed equipment
7. Airworthiness Directives (AD) or Service Bulletins (SB)
G. Commercial Sewing Machines
1. Machine types and stitch requirements for production of components and major repairs
2. Sewing machine maintenance
(A) Tools
(B) Lubrication
(C) Needles, sizes, types, uses
(D) Inspections
(E) Thread pick-up types (oscillating, rotating vertical, and rotating horizontal)
Change 1 (December 2015)
(F) Shuttle timing
(G) Feed dog, tooth type and feed adjustment
(H) Walking foot feed
(I) Stitch length adjustment
(J) Thread tension adjustment
(K) Thread tension disk adjustment
(L) Motor type, speed, clutch adjustment and application
(M) Double needle applications and stitch width
(N) Setting up machine to run .75 inch nylon binding tape and double and single needle installation
(O) Bar tack machines, stitch patterns and lengths
(P) Free arm machines, operation and uses
3. Harness geometry and junctions
4. Harness machine use and operation (7 class)
(A) 3 and 4 point harness junction stitch patterns
(B) Calculating pattern and stitch numbers to exceed webbing strength
(C) Chaffing strip uses and installation in harness junctions
(D) Main lift web confluence wrap at 3 ring
5. Double needle binding tape machine use and operation
(A) Appling binding tape to component edge
(B) Turning 90 degree corner appling tape
6. 304 zig zag stitch machine use and operations
(A) Stitch length adjustment
(B) Stitch width adjustment
7. Bar tack machine use and operation
Stitch width and length adjustment
H. Master Parachute Rigger Applicant Projects
Listed below are possible, projects or tasks you may be required to perform, during the master rigger practical test phase. They may
require only the repair or replacement of a single item, or possible construction and replacement of the entire assembly. All projects are
to be performed to return to service safety and manufacture standards.
1. Webbing joint construction / replace main lift web
2. Chest strap replacement
3. Partial top/bottom skin replacement (ram air canopy)
4. Line set repair or replacement, (round or ram air)
5. Complete panel replacement (round reserve canopy)
6. Main parachute riser, major repair or construction
7. Main parachute deployment bag construction
8. Installation of AAD in container system not factory ready
9. Construction of slider ram air canopy
10. Construct replacement leg pads for container system
11. Alter riser from l-bar to rapide link
12. Construct lower steering line assemblies and replacement toggles
13. Construct 32-inch hand deploy pilotchute
14. Construct and replace main side flap on container
15. Replace plastic stiffener and grommet reserve flap assembly
16. Build and install BOC pocket on container
17. Construct pull lines and channel for collapsible slider
18. Construct and replace lower leg straps on articulated harness
19. Replace parcel rib ram air
20. Construct collapsible pilotchute bridle assembly
These are just a few of the possible projects or task you may be required to perform during the practical portion of the master
parachute rigger test. It is important that you learn use of the proper machines, materials, construction methods, obtain the skills, and
knowledge to complete these projects to a return to service standard for safe use.
Change 1 (December 2015)
Accordion folding. The folding of the canopy for stacking
in the container prior to closing.
Administrator. The Federal Aviation Administrator (FAA)
or any person to whom he and/or she has delegated his and/
or her authority in the matter concerned.
Advisory circular (AC). The FAA issues advisory
circulars (ACs) to provide guidance and information in a
designated subject area or to show a method acceptable to
the Administrator for complying with a related Title 14 of the
Code of Federal Regulations (14 CFR). Each AC is issued
with a number corresponding to the subject it addresses in the
14 CFR. Unless incorporated into a regulation by reference,
the contents of an AC are not binding on the public.
Aerodynamics. The study of the behavior of moving air
and the forces that it produces as it passes over or around
certain shaped objects, such as wings, propellers, or
parachute canopies.
AGL. Above ground level.
Airframe and powerplant mechanic (A&P). Any
person certificated by the FAA to perform maintenance or
inspections on an aircraft’s airframe or powerplant.
Airworthiness Directives (ADs). Issued by the FAA to
notify owners and users of aeronautical products of unsafe
conditions and the mandatory corrections under which the
product may continue to be used. Each AD is an amendment to
14 CFR part 39, as such, it is part of the Federal Public Laws.
Airworthiness. A complete parachute assembly is considered
airworthy when it conforms to its Technical Standard Order
(TSO) and/or properly altered condition and is in condition
for safe operation.
Alteration. A change to the original configuration or any
other major change to any portion of the parachute from its
original manufacture’s specifications.
Glossary
Apex. The center and topmost point of a round
parachute canopy.
Approved. An item, which in its present form, has received
official certification from the FAA.
Assistor pocket. Air scoops at the top of a sleeve that provide
drag and aid in anchoring the sleeve as the canopy is pulled
out. Also, fabric pockets on the bridle of a free bag that aid
in the deployment of the bag in the event of a horseshoetype
malfunction.
Automatic activation device (AAD). A device for
automatically releasing the reserve or emergency parachute;
utilizes barometric and rate of descent sensors.
Auxiliary parachute. A reserve parachute.
Back parachute. A parachute that is worn on the back.
Backstitch. Used to anchor a row of stitching by turning the
material and sewing over the stitching for a short distance.
Back strap. A part of the harness that extends across the
wearer’s back. It may be diagonal, horizontal, or vertical and
may or may not be adjustable.
Backpad. A foam-filled pad placed between the harness and
the wearer that provides comfort and/or holds the harness
in place.
Bar tack. A concentrated series of zigzag-like stitches used to
reinforce points of stress.
Barometric pressure release. A device of the automatic
opening of a free-fall parachute operating on the differences
of barometric pressure.
Becket. A piece of tape or webbing sewn to a parachute or pack
to form a loop through which a cord or thread may be passed.
Beeswax. A wax, usually mixed 1:1 with paraffin and heated.
Webbing is dipped into it to prevent fraying.
Bellyband. A reserve tiedown strap.
Bias construction. Construction where the warp and filler
threads of the material are at 45 degrees to the centerline of
the gore.
Bias cut. A diagonal cut across a piece of fabric. Canopy
fabric may be cut on the bias and assembled so that both
warp and fill threads run at a 45 degree angle to the vertical
centerline of the gore.
Block construction. An arrangement of the gores such that
the warp threads are parallel to the peripheral hem.
Bobbin. A small spool used to hold thread. Commonly found
in sewing machines.
Bodkin. A large-eyed needle, flat or round, and usually
blunt, used to draw tape, ribbon, elastic, or cord through
a loop or hem. Used to pull pack opening bands through
containers.
Bolt. A compact package or roll of fabric.
Break tie. Any tie or tacking designed to break under a
specified amount of stress.
Breakaway. The jettisoning of the malfunctioned main
parachute by activating riser releases and deployment of the
reserve parachute; also known as cutaway.
Breakcord. A thread or tape tied between parachute
components that is intended to break under the desired load
during deployment.
Bridle. A line that attaches the pilot chute to the apex of the
canopy or to a sleeve or bag.
Bungees. Pack opening bands.
Burble. The turbulent and unstable airflow behind a falling
object, such as a skydiver in free fall.
Cable ripcord. A flexible metal cable 3⁄32" diameter made
of 49 strands of stainless steel wire. The cable runs from the
ripcord grip to the locking pins. It is housed in a flexible,
protective tube.
Calendering. The process where a machine with heated
rollers is used to finish fabric. The heat and pressure process
lowers permeability by forcing the fibers between each other
and flattening them.
Canopy. The umbrella-like surface of a parachute and its
framework of cords, called suspension lines, from which
the load is suspended. The drag surface of the decelerator.
Canopy fabric. The fabric used in the fabrication of parachute
canopies. It is lightweight and woven to withstand the impact
of air pressure when the parachute opens. The canopy fabric
is woven from nylon yarns usually in a ripstop weave.
Canopy relative work (CRW). A skydiving discipline where
the parachutists fly their open canopies in a formation formed
by grasping the canopies or lines using the hands or legs.
Canopy releases. Devices that allow immediate release of
the parachute canopy. They disconnect the harness main lift
webs from the risers.
Center pull. A ripcord design for chest parachutes.
Centerline. Lines that run from the risers to the apex of a
canopy and are used to pull the apex down, such as on a
Para Commander.
Certificated. A personnel parachute holding an FAA
TSO certificate. Also used to refer to other FAA-approved
parachutes, such as Government surplus personnel models,
which were manufactured under military contract.
CFM. Cubic feet per minute. A measure of permeability.
Chafing strip. A light piece of webbing positioned between
the load bearing webbing and a piece of hardware that acts
as a buffer between the two.
Chest parachute. A parachute worn on the wearer’s chest.
Chuck. The upper part of the tool used to install fastener or
grommet parts.
Chute. A contraction of the term “parachute,” and used
interchangeably with it.
Clamp. A medical hemostat used by riggers for picking
threads or retrieving small objects.
Closing loops. Fabric or cord loops used to secure the
container closed. Used in place of locking cones.
Cloth. A pliable fabric that is woven, felted, or knitted from
any filament; commonly fabric of woven cotton, woolen, silk,
nylon, rayon, or linen fiber.
Clove hitch knot. A type of knot used for attaching the
suspension lines of a parachute to the connector links.
Cloverleaf handle. A ripcord handle with a cloverleaf shape.
Commonly found on chest parachutes.
Cocking. Setting the collapsible bridle for operation.
Confluence wrap. A piece of webbing that wraps around the
confluence of two or more pieces of webbing. Prevents the
stitching from splitting. Most common use is on main risers
and the 3-ring harness ring installation.
Connector link. Usually identified as a small, rectangular
metal fitting used to connect ends of risers or lift webs to
suspension lines. The suspension lines are tied and sewn
above one part of the link, the webs being stitched about the
lower part. The design of the link may vary in size and shape
according to the intended use.
Connector link separable. Any connector link comprised of
readily separable elements, which may be used to facilitate
assembly of parachute canopies to a riser system.
Container. The portion of the parachute assembly that
holds the canopy in place after being folded. This is not to
be confused with the term “pack.”
Contamination. Where foreign materials or substances come
into contact with parachute materials and possibly cause
degradation or weakening of the materials.
Cords. Suspension lines.
Cross connector strap. A webbing strap attached between
the risers to prevent the collapse of the canopy in the event
one riser becomes disconnected.
Cross seam. A seam joining sections of a panel.
Cutaway. The cutting of risers or suspension lines to release
the deployed canopy while the parachutist is still in the air.
Also known as breakaway.
D-ring. A metal fitting shaped like a D into which snap
connectors are hooked.
Daisy chain. A method of gathering the suspension lines
when field packing a parachute so as to reduce the possibility
of their becoming entangled.
Damage chart. A graphic representation of a canopy used
to identify and mark damaged areas for repair.
Dart. A short, tapered seam.
Data pocket. Small patch pockets sewed to the inside and
outside surfaces of a parachute container for carrying the
parachute record card.
Decelerate. To slow down. A free-falling body decreases its
rate of descent due to pressure of the atmosphere against its
frontal area. This resistance gradually increases as the falling
body nears the earth due to increasing atmospheric pressure.
Denier. A unit of measurement of silk in which the size of
yarn is quoted as its weight per length. This is determined
by weighing 9,000 meters and quoting the size of the yarn
in grams. Thus, if 9,000 meters weigh 30 grams, the size of
the yarn is then known as 30 denier.
Deployment. That portion of a parachute’s operation
occurring from the moment of pack opening to the instant the
suspension lines are fully stretched but prior to the inflation
of the canopy. Also known as development.
Deployment bag. A container, typically fabric, and usually
enclosed in a parachute pack containing a parachute canopy.
Deployment device. A sleeve or bag.
Designated parachute rigger examiner (DPRE). A master
parachute rigger appointed by the Administrator to conduct
oral and practical tests required for the certification of
parachute riggers.
Diagonal seam. A French fell seam of the canopy that joins
two sections of a gore. Diagonal seams meet the centerline
of the gore at angles of 45 degrees and 135 degrees.
Diameter. The greatest distance across a flat canopy, from
skirt to skirt, measured when the canopy is lying flat. This
measurement designates the size of the parachute in feet.
Diaper. Generally, a fabric panel secured by the suspension
lines, which is sewn to and wrapped around the canopy.
Used to control and reduce opening forces. Found mostly
on round reserves.
Die. The lower part of the tool used in a press to install snap
fasteners or grommets.
Direct bag static line system. A static line deployment
system where the bag is attached to the static line and the
canopy deploys free into the airstream.
Double throw zigzag stitching. Stitching in which the needle
makes a center stitch between each left and right stitch. Also
known as a No. 308 stitch.
Double-W. A three-point cross-stitch.
Drop test. Dropping a dummy or other load from an aircraft
in flight or otherwise simulating a live jump to prove
serviceability of a parachute.
Drop zone (DZ). A specified area upon which personnel or
equipment are dropped by parachute.
Drying tower. A facility where parachutes are suspended
for airing and drying.
Dual parachute packs. A sport assembly consisting of a
main and a reserve parachute.
Dummy (parachute). Torso-shaped dummy of variable
weight used for testing parachutes; may be of fixed or
articulated construction.
Dummy drop. A parachute test using a dummy as the
suspended load.
Durable dot fastener. The common snap fastener used for
closing flaps, etc.
Ejector type snap harness. A harness snap that attaches to
the V-ring to secure two parts of the harness together. An
ejector arm expels the V-ring when the finger-grip lever is
pulled outward.
Emergency parachute. A certificated parachute intended
for emergency use.
End flap. The fabric on the end of a pack as opposed to the
side, used to enclose and protect the canopy.
End tabs. Metal tabs on the end flap of the pack (principally
chest and seat containers) used to secure it closed.
Eye. A small steel-wire loop attached to the parachute pack
into which a hook on a pack-opening elastic is fastened.
Fastener slide. Zipper.
Federal Aviation Administration (FAA). An organization
within the Department of Transportation. The FAA
establishes aviation rules and regulations, as well as enforces
those policies. The purpose of the FAA is to set the standards
for civil aircraft in the interest of public safety.
Feed dog. A mechanical device located under the throat
plate of a sewing machine that feeds the material through a
sewing machine.
Ferrule. Device that provides a strong and smooth finish on
the ends of a ripcord housing.
Fid. A small, flat, tapered bar of metal or wood used to insert
the corner flaps into the container when packing.
Finger trap. A method of attaching or splicing lines by
inserting one line into another. Used primarily on hollow
braided lines.
Finish. The condition of the parachute fabric caused by the
application of heat and pressure whereby the fibers are
forced closer together. This treatment is used to determine
the permeability of the fabric.
Fish scale. A spring scale used to measure the ripcord pull
force or fabric strength test.
Folder. A device used as an attachment to a sewing machine
to guide and fold fabric.
Force. A push or pull that tends to change the velocity or
direction of a body’s motion.
Forging. A high-pressure shaping of hot metal. The process
used to make parachute hardware.
Forward speed. The rate at which a parachute moves
horizontally in a mass of air.
Four line check. On a round canopy, the four lines that run
to the top center and bottom center gores. Used to check the
line continuity. On a 28-foot canopy, they are lines 1, 14,
15, and 28.
FPS. Feet per second.
Free bag. A type 5 reserve deployment device used with
ram-air canopies. Not attached to the canopy, it is designed to
allow deployment of the canopy in the event of a horseshoe-
type malfunction.
Free fall. A parachute jump in which the parachute is
activated manually at the discretion of the parachutist.
French fell seam (LSC-2). A plain overlap where material
is folded over on itself and stitched to prevent raveling.
Friction burns. The result of two textile surfaces rubbing
together rapidly and generating frictional heat, which reduces
the tensile strength of the textile and causes deterioration of
the individual threads; it occurs primarily during parachute
deployment and initial inflation.
G force. The measure or value of the gravitational pull of the
earth as modified by the earth’s rotation, equal to acceleration
of a freely moving body at the rate of 32.16 feet per second.
Example: If a 100-pound load places a 300-pound stress on
the parachute during opening, the shock is 3 Gs.
Gauge. The space between needles on a sewing machine.
Glide. The horizontal movement of the canopy.
Gore. The portion of the canopy contained between two
adjacent suspension lines and the area between them,
extending from the apex of the canopy to the skirt.
Grommet. A metal eyelet used as a reinforcement around a
hole in fabric. Grommets are used on pack flaps to fit over
locking cones or loops.
Gross weight. The complete weight of the parachute assembly.
Guide or control line. One or more parachute lines that run
from a slot or orifice in a steerable canopy to the harness
providing better steerability.
HALO. High Altitude, Low Opening.
Handle. Ripcord handpull or grip.
Hardware. All metal parts associated with parachutes,
parachute systems, and their suspended loads.
Harness. An arrangement of cotton, linen, or nylon webbing
designed to conform to the shape of the load to be carried
in order to secure it properly so that the opening shock and
the weight of the load are evenly distributed during descent.
Harness keeper. Elastic webbing used to hold harness straps
in place.
Harness main sling. The main load-carrying member of the
harness formed by two lengths of webbing, beginning at the
shoulder adapter or D-ring, continuing down across the seat
and up the other side, ending at the opposite adapter or Dring.
Hesitator loop. One of a series of webbing loops that hold
the suspension lines in an orderly position in the container
when the parachute is packed and which pay the lines out in
sequence (hesitate) for orderly deployment.
Hot knife. An electrically-heated cutting tool used to cut and
sear webbing and fabrics.
Housing clamp stiffener. A metal plate sewn to the top flap
of the main parachute container and used to hold the ripcord
cable housing in place and to give rigidity to the housing.
Designed to provide stiff separation between the housing and
the top cone for an automatic opener.
Hygroscopic. A substance or material that absorbs water
readily from its surroundings.
Initial layout. Process in which the canopy is stretched out
on the table with the top center gore on top in preparation
for securing proper layout.
Inspection. A step-by-step procedure for examining a
parachute prior to packing to identify any damage or non-
airworthy condition.
Inversion. State in which the canopy has been turned
completely inside out. Also see partial inversion.
Joint efficiency. The comparison of the strength of the
junction or joining materials against the original materials.
Jumping. To engage in a premeditated parachute jump.
Kicker plate. A launching disc which is placed under the
pilot chute.
Kill-line collapsible bridle. A main pilot chute bridle
configuration whereby the pilot chute is collapsed by use of
a retractable centerline after it has deployed the parachute.
L/D. Lift to drag ratio.
Lap parachute. A parachute that rests in the lap of the wearer
and attaches to the harness with risers to snaps and D-rings
on the front. Resembles a chest parachute with long risers.
Not in current use.
Lateral band. Lower (in the periphery) or upper (in the vent
hem), a reinforcement web.
Launching disc. A kicker plate placed under the pilot chute.
Leg strap. That part of the harness webbing that encircles
the wearer’s leg. The leg straps can be adjusted to fit the user.
Life cycle. Service life. The time that a parachute may be
considered usable.
Lift web (main). The portion of the harness from the shoulder
to the hip area; generally from the canopy releases to the leg
strap junction.
Lift webs. The front portion of the harness from the shoulder
to the leg strap junction; includes the risers if there are no
riser releases.
Lift. The force perpendicular to drag that helps reduce
vertical descent.
Line extension. When the lines are fully deployed; prior to
line stretch.
Line separator. A tool used to separate and hold the lines
of a round parachute during the packing process.
Line stowing. The process of drawing the suspension lines
into suspension line retaining loops in the parachute pack;
accomplished to prevent entanglement or twisting of the
lines during opening of the parachute. Stows may be held
by retaining loops or rubber bands.
Line stretch. Occurs during deployment, after the lines are
fully extended. Follows snatch force and line extension.
Line-over. A type of deployment malfunction that occurs
when one or more suspension lines pass over the top of the
canopy during deployment preventing complete, normal
inflation. Not to be confused with “partial inversions.”
Locking cone. A cone shaped metal device used in
conjunction with end tabs and ripcord pins to hold the
container flaps closed.
Locking pins. Straight or curved metal pins used with
a throwout or pull-out pilot chute for securing the
container closed.
Locking ripcord pin. A small metal prong, slightly smaller
in diameter than the ripcord cable and fastened to it by means
of a swage fitting or serving and solder. One pin is attached
to the end of the cable and the others (when two or more are
used) are set at intervals on the cable. The spacing of the
pins is dependant on the distance between the cones on the
container flap. The locking pins pass through the locking
cones of the flaps and thus serve to lock the container until
such time as the pins are withdrawn.
Lockstitch. Type of stitching used in manufacturing
parachutes. This type of stitch is formed by two threads. A
loop of the thread is passed through the material where it is
entered by the supply of the other thread. The loop of the first
thread is drawn into the material to the extent that the loop or
lock is approximately halfway between the two surfaces of
the material. Also known as a type 301 stitch.
Loft. A facility for the repair and maintenance of parachutes.
Logbook. A format for complying with 14 CFR part 65,
subsection 65.131(a) in regards to recording the work done
by the rigger on parachutes.
Machine head. The entire metal housing that supports the
moving parts and bearings of the machine.
Main parachute. A parachute assembly, excluding the
harness, that is used in conjunction with a reserve parachute
assembly as the primary assembly for a premeditated jump.
Main seam. That which joins two adjacent gores in a canopy;
also known as a radial seam.
Maintenance. Inspection, overhaul, repair, preservation, and
replacement of parts but excludes preventative maintenance.
Major repair. A repair that, if improperly done, might
appreciably affect weight, balance, structure strength,
performance, powerplant operation, flight characteristics
or other qualities affecting airworthiness; or that is not
according to accepted practices or cannot be done by
elementary operations.
Malfunction. The complete or partial failure of the
parachute canopy to effect proper opening and descent. Some
malfunctions are canopy damage, twisted suspension lines,
inversion or semi-inversion of the canopy, a line over, etc.
Malfunction or Defect Report, FAA Form 8330-2. A form
used to report serious defects or other recurring unairworthy
conditions of parachutes or aircraft.
Marquisette. Netting.
Mass. The quantity of matter in an object.
Master Parachute Rigger. An individual certified by the
FAA to pack, maintain, and alter parachutes. The highest
classification of parachute rigger.
Maximum operating weight. The total weight of the
parachutist and all equipment that exits the aircraft with
the jumper.
Mildew. A type of fungus or mold that forms on fabric
and leather in damp environments. Mildew weakens some
materials and if it appears on a parachute canopy, the areas
must be cleaned, repaired, or replaced.
Military specification (MIL-SPEC). A specification set by
military agencies and used for the procurement of military
supplies and equipment.
Minor repair. A repair other than a major repair.
Modification. 1. A change. 2. Often refers to the removing
of canopy area to effect steerability and forward glide.
Mouth lock. A device that holds the mouth of the canopy
closed until the lines are deployed.
MPH. Miles per hour.
MSL. Mean sea level.
MS. Military Specification under the MS system.
NAS-804. National Aircraft Standards Specifications
Number 804; this is the minimum performance standards
required by Technical Standard Order, TSO-C23b, for
parachute assemblies manufactured under this TSO.
National Airspace Standards (NAS). National Aircraft
Standards.
Needle. A small, slender, pointed piece of steel with a hole
for thread used for sewing.
Nicopress. A copper sleeve used to join cables to form loops
or splices.
Nylon. A synthetic material of protein-like structure derived
from coal, air, and water, which is adapted for fashioning into
filaments of extreme toughness, strength, and elasticity and
used in the manufacture of parachutes.
Opening shock. The decelerating force exerted on the load
following that of the snatch force. Caused by the acceleration
of the canopy and the air mass associated with it.
Opening time. The time elapsing between the opening
of a parachute pack and the opening of the canopy to its
fullest extent.
Oscillation. Pendulum-like swinging of the suspended load
beneath the inflated canopy; usually the result of trapped air
escaping under the lower lateral band.
Outboard. Facing to the outside, such as a ripcord facing
to the side of the jumper rather than toward the breastbone.
Overhand knot. A simple knot tied separately in each end
of a piece of cord above a square, surgeon’s, or other knot
to prevent the end from slipping through the lower knot.
Pack. A synonymous term for the parachute container.
Pack opening band. A cloth-covered steel spring assembly
with hooks at each end used to expedite the opening of the
pack by rapidly pulling the flaps away from the canopy.
Pack stiffener. Generally, metal stiffeners used in military
assemblies to give shape and form to the pack.
Pack tray. The portion of the container or deployment device
where the lines are stowed.
Packing bar. A long, flat bar of metal or wood used in the
folding of the canopy of a parachute during the packing
process and to aid in closing the container; also known as a
long bar, paddle, or fid.
Packing hook. A special hook-like tool used to draw the
suspension lines into place in the hesitator loops. Pull-up
cords are sometimes used for this purpose.
Packing paddle. A flat, narrow piece of metal or wood
used to form the packed container; also known as a packing
bar or fid.
Packing table. A table used in packing parachutes, normally
3 feet wide by 40 feet long with a smooth top surface.
Packing. The operation of folding the canopy and enclosing
it in the container.
Panel. A subdivision of a gore; also known as a section.
Parachute. An umbrella-like device designed to trap a large
volume of air in order to slow the descent of a falling load
attached to the parachute. The word “parachute” is formed
from the French words “para,” for shield, and “chute,” to fall.
Thus, “parachute” literally means “to defend from a fall.”
Parachute Industry Association (PIA). An international
trade organization composed of parachute manufacturers,
dealers, riggers, and others involved in the parachute industry.
Parachute pack. Such as a back pack or chest pack, means
the parachute assembly less the harness. It means the
container, canopy, suspension lines, pilot chute risers and
connector links. The terms “pack” and “container” are not
synonymous in the terminology of this part.
Parachute record card. A card kept in the record pocket
that records the packing intervals of the parachute and other
important information as required under 14 CFR part 65,
subsection 65.131(c). Also known as the “packing data card.”
Parachute rigger. A person certified by the FAA to perform
packing and maintenance on parachutes.
Parachute rigging. The process of inspecting, repairing,
and replacing minor parts of a parachute assembly and of
repacking the parachute so that it is ready for immediate
use. Parachute rigging also includes fitting and adjusting
the harness.
Parachute standard (PS). PIA specification for parachute
materials.
Partial inversion. A type of deployment malfunction
that occurs when one or more gore sections near the skirt
become inverted during deployment and form a small pocket
which inflates, causing a partial inversion of the canopy.
The condition may or may not work out or may become a
complete inversion (i.e., the canopy turns completely inside-
out). It is the skirt, not the line, which is “over;” not to be
confused with a “line-over.” Also known as a “Mae West.”
Patching. Method of repair by covering a hole or tear in a
canopy or pack.
Performance standards. The specifications that define the
minimum performance and safety standards for certificating
parachutes. There are three standards that have been used
or are in use: NAS-804, AS-8015A, and AS-8015B.
Permeability. The mass rate of flow or the volume rate of
flow per unit projected area of cloth for a prescribed pressure
differential. In the U.S., permeability is measured in cubic
feet of air through one square foot per minute at ½" of water
pressure. Sometimes confused with porosity.
Personnel parachutes. Parachutes designed expressly for
human use as opposed to cargo drops or aircraft deceleration.
Piggyback. A single harness, dual parachute system used
for intentional parachute jumping where both parachutes are
mounted on the back of the jumper.
Pilot chute assist system. A connection of breakcord or
Velcro® between the static line and the pilot chute of a sport
parachute, which pulls the pilot chute out of the pack and
then separates.
Pilot chute. A small parachute used to accelerate deployment;
constructed in much the same manner as the main canopy
and from similar material. Some types of pilot chutes are
equipped with a spring-operated, quick-opening device.
The frame is compressed so as to open immediately when
released from the pack.
Pin protector flap. A flap that covers the locking pins and
cones to prevent the pack from being opened by any means
other than the ripcord.
Pleat. A fold sewn in the fabric.
Pocket ripcord handle. Elastic or spring-edged pocket that
holds ripcord handle in an accessible position on the harness.
The chest-type pocket consists of a piece of straight elastic
webbing serving the same purpose.
Porosity. The ratio of void or interstitial area to total area of a
cloth expressed in percent. The ratio of open space to covered
area of a drag surface. Used for ring slot, ribbon, ring sail,
and rotafoil canopies. Not to be confused with permeability.
Premature opening. Any accidental opening of the
parachute prior to the intended time.
Prepack inspection. The inspection made on the parachute
prior to its packing.
Presser foot. The part of the sewing machine above the feed
dog that holds the fabric in place.
Preventative maintenance (PM). The systematic care,
servicing, and inspection of equipment and facilities for the
purpose of maintaining them in a serviceable condition and
detecting and correcting incipient failures. Simple or minor
preservation operations and the replacement of small standard
parts not involving complex assembly operations.
Proof load. The testing of an item for conformance with
strength requirements.
Proper layout. Process by which the canopy and suspension
lines are arranged on the packing table for inspection
and packing.
Pull the dot. A particular type of snap fastener that can only
be opened or closed by pulling in one direction designated
by an indented dot on the button.
Pull-up cords. Nylon cords of varying length used to pull up
the sides and ends of the container flaps over the container
cones and to pull the cones through the grommets.They are
also used to pull the suspension lines into place in some
types of containers.
Quality control. A method of describing the inspection
and test procedures necessary to ensure that each article
produced conforms to the type design and is in a condition
for safe operation.
Quick connector snap. A large hook-shaped, spring-loaded
snap, two of which are used to quickly attach the chest-type
parachute to the two D-rings on the harness.
Radial seam. A seam extending from the skirt to the apex,
joining two gores. A portion of the suspension lines may be
concealed in the tube formed by the radial seam.
Ram-air parachute. Generally, a rectangular, double-
surface canopy with airfoil shaped ribs inflated by the air
flowing into the front openings to produce an airfoil shape.
Rate of descent. The vertical velocity, in feet per second, of
a fully-opened parachute.
Rating. A statement that, as a part of a certificate, sets forth
special conditions, privileges, or limitations.
Ravel (unravel). To separate, untwist, or unwind, leaving a
frayed or ragged edge. “Unravel” is often used with the same
meaning, although grammatically incorrect.
Raw edge. The unfinished edge of the material; liable
to raveling.
Reefing. A temporary restriction of the skirt of a parachute
to a diameter less than the fully inflated diameter. Reefing is
used to decrease drag area and/or to obtain stability.
Reinforcements. Commonly strong tape or webbing used to
strengthen parts of the canopy, container, or harness.
Relative humidity. Ratio of the amount of water vapor
present in the air to that which the air would hold at saturation
at the same temperature.
Repack cycle. The time that a certificated parachute is
considered to be airworthy before being inspected and
repacked. The current U.S. repack cycle is 180 days.
Reserve parachute. The second or “auxiliary” parachute
worn by a person making a premeditated jump.
Reserve static line (RSL). A backup device for activating
the reserve after a cutaway. Usually a line, webbing, or
cable that connects the main risers with the ripcord handle,
housing, or cable.
Restitching. The process of sewing directly over base or
broken stitching.
Retainer band. A rubber band used to hold folded suspension
lines or static lines to the parachute pack.
Rig. 1. To pack. 2. A set of sport parachute equipment. 3.
To assemble a parachute.
Rigger roll. To prepare an unpacked parachute for storage
by rolling the canopy into a ball with the suspension lines
around it.
Ripcord. A locking device that secures the pack in a closed
condition and by which the release of the parachute is
effected. It may consist of a handle, cable, locking pins, and
a cable swage.
Ripcord cable. A flexible cable joining the locking pins and
the ripcord handle.
Ripcord housing. A flexible tubing in which the ripcord
is installed for protection and to provide a free path for
the ripcord.
Ripcord housing clamp. A metal clamp located on the
outside of the end flap of back and seat-type parachutes.
The clamp secures the ripcord cable and power cable of
the actuator.
Ripstop nylon. A type of weave designed to prevent tears
from spreading. Extra numbers of yarns are closely woven
into the cloth intermittently across the width and across
the length.
Ripstop tape. Ripstop nylon fabric with a pressure sensitive
adhesive. Used to repair small tears in canopies.
Riser. The portion of the suspension system between the
lower end of a group of suspension lines and the point of
attachment to the load.
Riser release. A canopy release.
Roll packing. A method of packing a ram-air parachute
whereby the nose and the tail are rolled towards the center
of the canopy.
Routine inspection. A visual inspection of all parts of a
packed parachute that may be checked without opening the
parachute.
S.A.E. Society of Automotive Engineers.
Saddle. The part of the harness positioned under the seat of
the wearer.
Safety tie. The thread used in sealing a parachute.
Scissors. A cutting instrument with two opposing blades.
Seal press. A mechanical press used for compressing lead
seals to seal parachutes in accordance with 14 CFR part
65, subsection 65.133.
Seam ripper. A small tool used for picking or cutting threads
in sewing operations.
Seams. Where two pieces of fabric are joined together.
Sear. Damage to fabric or lines by heat generated through
rubbing. The melting of webbing, fabric, or line of nylon to
prevent fraying.
Seat parachute. Parachute positioned below the back of the
wearer. Forms part of the seat cushion in the aircraft.
Section. Any one of the pieces of cloth which, when
assembled, form one gore of a parachute canopy. Also known
as a panel.
Selvage edge. The edge of cloth which is so woven as to
prevent raveling.
Senior Parachute Rigger. An individual certified by the
FAA to pack and maintain parachutes. A journeyman level
classification of parachute rigger.
Sewing machine. A machine with a mechanically-driven
needle used for sewing.
Sewing machine knee lifter. A knee-operated mechanism
that lifts the presser foot of a sewing machine.
Sewing machine uprise. The uprise is the upright part of
the head (generally located on the right side of the head) that
houses a portion of the moving parts that transmit motion
through mechanical shafts and linkages to the mechanisms
in the base of the machine.
Sewing pattern. A design outlined in drawings for
joining parts.
Shock cord. A straight elastic cord comprised of continuous
strands of rubber encased in a braided cover. Used today
primarily for Safety Stow® loops on free bags.
Shock load. The maximum force exerted on the canopy by
inflation. This maximum force may be the snatch force or it
may be the opening shock.
Shot bag. A parachute packing tool. A rectangular bag
filled with shot and used to hold folded gores in position
during packing.
Shoulder strap. The part of the harness webbing that crosses
the wearer’s back diagonally between the shoulder blades
and the horizontal backstrap.
Side flap. Fabric extensions on each of the long sides of the
pack that fold over to enclose the canopy.
Silk. A fiber produced by the silk worm.
Single point release. A harness release that has a single
closure, such as the T-10 type; also a canopy release system
operated by one hand or action.
Single throw zigzag. A machine zigzag stitch from left to
right to left, etc. Also known as a 304 stitch.
Skirt. The reinforced hem forming the periphery of a canopy.
Skydiving. A popular name for sport parachuting.
Slag. A type 6 deployment device. A short sleeve
configuration used on ram-air parachutes.
Sleeve. A tapered, fabric tube in which the canopy is placed
to control deployment. A deployment device.
Sliders. A reefing device usually for ram-air canopies.
Comprised of a fabric panel with grommets at the corners
through which pass the suspension lines of the canopy.
Snag. A fabric imperfection.
Snap fastener. Metal fastening device that usually consists
of four parts: button, socket, stud, and eyelet. Device is
manufactured in various shapes and sizes.
Snatch force. The shock produced on the load when the
parachute assembly fully strings out and becomes suddenly
accelerated to the same speed as the load. Comes just prior
to opening shock.
Sniveling. Slow opening of a parachute.
SPEC. Specification and/or MIL-SPEC (military specification).
Spiral vane pilot chute. A pilot chute with a cone-shaped,
cloth-covered coil spring used in free-type parachute
assemblies.
Splicing. The process of joining together, as the interweaving
of strands, overlapping and stitching of materials.
Split saddle. The lower part of a harness that has independent
leg straps; no saddle cross strap.
Sport parachuting. The making of premeditated parachute
jumps for pleasure.
Sport rig. A skydiving harness and container system.
Square knot. A strong knot for joining two cords or lines,
which does not slip or loosen easily.
Square parachute. A gliding or ram-air canopy having a
square or rectangular shape.
Stand. A sewing machine table.
Static line. A line, cable, or webbing, one end of which is
fastened to the pack, the other to some part of the launching
vehicle; used to open a pack or to deploy a canopy.
Static line operated parachute. A parachute operated by
a length of webbing after a jumper has fallen the length of
the static line. The ripcord pins are pulled from the pack,
the parachute opens, and a “break tie” breaks, freeing the
parachute.
Static line system. A parachute system that is attached to the
aircraft with a line and automatically deploys the parachute.
Straps. The webbing components of a harness.
Surgeon’s knot. A type of knot commonly used for tying
nylon threads or cords in place of a square knot to prevent
mis-tying.
Suspension lines. Cords or webbing of silk, nylon, cotton,
rayon, or other textile materials that connect the drag surface
of the parachute to the harness. They are the means by which
the wearer or weight is hung or suspended from the inflated
canopy.
Swages. The ball or other device used at the end of a ripcord
to secure the cable to the handle.
Tail pocket. A deployment device sewn onto the tail of a
ram-air canopy used to stow the suspension lines.
Tandem. A dual harness, dual parachute system for use by
two people under the same main parachute.
Tapes. Narrow woven ribbons used for reinforcing parachutes.
Tape fastener. Velcro®.
Technical standard order. A minimum performance standard
for specified articles, such as materials, parts, processes, or
appliances used on civil aircraft.
Tension plate. A device hooked into the connector links in
order to put tension on the canopy while packing.
Thread. A thin continuous filament made by spinning fibers
and combining the strands.
Title 14 of the Code of Federal Regulations (14 CFR). The
rules, regulations, and guidelines established by the FAA to
govern the operation of aircraft, airways, airmen, and the
safe operation of civil aircraft.
Toggle. A knob or webbing loop at the end of the steering
line for grasping by the parachutist.
Trimming. Clipping or paring to reduce to a neat orderly state.
Tubular nylon. Sleevelike weave, seamless, and pressed
flat, similar in appearance to tape, but stronger and hollow
in the center.
Tuck. A shortening of material caused by pulling fabric up
in folds and stitching across the gathered fabric.
Ultimate load. Maximum load that can be applied without
causing any part of the structure to fail.
Ultraviolet light damage. Degradation of nylon fabric
by exposure to sunlight or fluorescent lights. Identified by
a yellowish color on white fabric or excessive fading to
colored fabric.
United States Parachute Association. A nonprofit division
of the National Aeronautic Association (NAA) that governs
sport parachuting activities in the U.S.
V-ring. A metal fitting shaped in the form of a closed letter
V, used with snaps to secure or attach a load to a parachute.
Velcro®. The commercial name for hook and pile
nylontape fastener.
Velocity. A vector quantity that includes both magnitude
(speed) and direction relation to a given frame of reference;
also the time rate of change of position.
Vent. The opening at the top, or peak, of the canopy.
Vent cap. A piece of fabric sewn to the upper lateral band
and covering the vent; also known as a vent patch.
Warp. The threads that run parallel to the selvage edge of
cloth; those which are crossed by the filling threads.
Weave. The forming of a textile by interlacing yarns. The
making or manufacturing of cloth on a loom by interlacing
warp and filling yarns.
Webbing. A stout, closewoven tape used for straps, belts,
harnesses, etc.
Weight (fabric). The weight of fabric measured in ounces
per square yard.
Weight. Gravitational force on a mass.
Wrinkles. A series of small pleats.
Zigzag. A stitch formation of alternating left and right throw
stitches, usually made on a sewing machine that moves the
needle bar alternately left and right during sewing.
Zipper. A slide fastener.
Symbols
3-cord cotton thread–waxed .........................................6-10
6-inch adjustable wrench .............................................6-10
6-inch stainless steel rule ...............................................6-4
14 CFR part 1—definitions ............................................1-8
14 CFR part 21 subpart O—Technical Standard
Orders (TSO) .................................................................1-8
14 CFR part 91—General Operating and Flight Rules . .1-9
14 CFR part 105 subpart C—Parachute Equipment
and Packing ....................................................................1-9
Accessory components .................................................7-65
Acid contamination ......................................................7-10
Action .......................................................................7-10
Airing and drying .........................................................5-13
Alterations ....................................................................7-73
Approved data ..............................................................7-11
Articulated harness main lift web (MLW) resizing .....7-73
Articulated upper leg hardware replacement ...............7-56
Assemble and pack (A&P) .............................................1-7
Assembling the reserve system ....................................5-28
Step 1. Layout and setting up packing clamps .........5-29
Step 2. Stacking and pleating the reserve canopy ....5-29
Step 3. Setting the brakes .........................................5-31
Step 4. Folding the canopy .......................................5-32
Step 5. Placing the canopy into the deployment
bag and stowing the lines .........................................5-33
Step 6. Placing the bag into the container and
closing the container .................................................5-35
Assembly of components and compatibility ................4-13
Assembly of the main canopy to the harness and
container .......................................................................4-11
3-ring release handle ................................................4-13
Harness 3-ring attachment ........................................4-12
Main riser rings ........................................................4-13
Release housings ......................................................4-13
Automatic activation devices .......................................2-18
Automatic activation device (AAD) installation .........7-77
Adhesive channel installation ...................................7-78
Built-in channel modification configuration.............7-78
Cutter channel and elastic installation ......................7-79
Beeswax .......................................................................6-12
Bias construction ............................................................2-6
Binding tool .................................................................6-13
Block construction .........................................................2-6
Bottom of container (BOC) pocket ..............................7-85
Bottom of container (BOC) pocket replacement .........7-48
Bridle ............................................................................2-15
Pre-sewn bridle .........................................................2-15
Square reserve bridles ..............................................2-15
Tubular nylon bridle .................................................2-15
Bridle and deployment devices ....................................2-11
Bridle length .................................................................4-10
Butane cigarette lighter ..................................................6-4
Cable cutters .................................................................6-11
Canopy and lines ..........................................................7-13
Canopy assembly and line continuity ..........................5-14
Canopy design ................................................................2-5
Canopy ripstop tape repair ...........................................7-16
Center cell top skin ........................................................7-7
Certification specifications .............................................1-9
Chest strap replacement ...............................................7-51
Cleaning and washing procedures ...............................7-89
Cleaning the parachute .................................................7-11
Hand washing (if absolutely necessary) ...................7-11
Closing plate ..................................................................6-6
Collapsible pilot chute/bridle system ...........................2-16
Bungee collapsible configuration .............................2-16
Kill-line collapsible configuration ............................2-16
Index
Colorfastness ................................................................7-89
Component compatibility ...............................................5-4
Component parts ............................................................2-2
Compound feed machine .............................................6-20
Configuration .................................................................2-7
Connector link separator tool .........................................6-7
Consew 206RB ............................................................6-16
Construction concepts and techniques ...........................2-5
Container ............................................2-6, 5-12, 5-17, 7-38
Container fabric panel repair .......................................7-38
Binding tape repair or splice ....................................7-39
Hidden patches .........................................................7-40
Overlay patches ........................................................7-40
Single-side fabric patches .........................................7-41
Container grommet replacement ..................................7-42
Container plastic stiffener replacement .......................7-44
Container Velcro® replacement ....................................7-43
Contamination conditions ..............................................7-8
Continuous line method ...............................................7-34
Cords, lines, and threads ................................................3-8
Currency requirements ...................................................1-6
Cutting pad ...................................................................6-13
Damage ..........................................................................2-6
Damage identification ....................................................5-8
Deployment and inflation characteristics .......................4-8
Deployment type ................................................ 2-12, 4-16
Type 1: Canopy first deployment .............................2-12
Type 2: Two-stow diaper or half diaper ...................2-12
Type 3: Ascuitto or piglet-style flat diaper ...............2-13
Type 4: Handbury or preserve full diaper ................2-13
Type 5: Free bag .......................................................2-13
Type 6: Sleeves ........................................................2-13
Designated Parachute Rigger Examiner (DPRE) ..........1-3
Detailed information on square canopy repairs ...........7-14
Documentation .............................................................5-39
Drop feed machine .......................................................6-19
Drying a parachute .......................................................7-11
Earning a Parachute Rigger Certificate ..........................1-2
Alternate means of qualifying for a Parachute
Rigger Certificate .......................................................1-3
Retesting .....................................................................1-3
Testing ........................................................................1-3
Emergency parachute canopy ........................................2-2
Fabric marking pencils and felt tip markers ..................6-4
Fabrics .................................................................... 3-2, 7-6
Facilities and tools .........................................................1-5
Fasteners ......................................................................3-21
Finger-trapping needle ...................................................6-4
Finger-trapping wire ......................................................6-5
Flat packing ....................................................................4-2
Grommet protectors .......................................................7-5
Hand deploy pilot chutes .............................................2-17
Pull-out pilot chute (POP) configuration ..................2-18
Throw-out pilot chute (TOP) configuration .............2-17
Hand tacking needles .....................................................6-9
Hand tacking techniques ..............................................7-86
Hand tools ......................................................................6-2
Hardware ......................................................................3-12
Harness ............................................................... 5-11, 5-17
Harness and risers ........................................................7-51
Harness/container ...........................................................2-2
Deployment devices for the main and reserve
parachutes ...................................................................2-3
Main parachute release mechanism and
associated handles or static lines ................................2-3
Other harness/container assembly components ..........2-4
Pilot chutes and bridles for the main and reserve
parachutes ...................................................................2-2
Ripcords or equivalent devices for the main and
reserve parachutes ......................................................2-3
Risers and associated steering toggles........................2-3
Harness design ...............................................................2-9
Harness strength ...........................................................4-14
Hemostats or clamp ........................................................6-2
High-density polyethylene (HDPE) .............................3-20
Hole punches ................................................................6-13
Hot glue gun .................................................................6-12
Hot knife element with cutting tip, basting tip,
and stand ......................................................................6-12
Housings ......................................................................3-22
Push-pull system ......................................................3-24
Identification ..................................................................5-2
Identification and nomenclature ...................................6-16
Inor repair .......................................................................7-8
Inspect and repack (I&R) ...............................................1-7
Inspection ............................................................. 5-2, 5-16
Inspection process ..........................................................7-2
Installing the needle and threading the machine ..........6-21
Lead seals and seal thread ..............................................6-8
Lexan® ..........................................................................3-20
Line attachments ............................................................7-6
Line dump ......................................................................4-8
Lines ...............................................................................7-5
Line separator (suspension line holder) .........................6-7
Line strip ........................................................................4-8
Links ..............................................................................7-5
Locking pull-up cord ......................................................6-5
Lower leg strap shortening ...........................................7-54
Machine maintenance ..................................................6-23
Magnum® pilot chute ...................................................2-17
Main and reserve closing loop manufacture ................7-80
Main container side flap replacement ..........................7-46
Main deployment bag ..................................................7-82
Main deployment bag repair—closing flap
grommet pullout ...........................................................7-72
Main parachute canopy ..................................................2-2
Main pilot chute .............................................................4-9
Main riser 3-ring locking loop replacement .................7-62
Main riser steering toggle Velcro® replacement ..........7-64
Major repair ...................................................................7-8
Manufacturing .................................................... 7-80, 7-86
Master Parachute Rigger ................................................1-2
Material repair and grommet replacement ...................7-43
Materials .............................................................. 2-6, 7-14
Materials storage area ..................................................6-28
Miscellaneous ..............................................................3-26
Modern design concepts ................................................2-8
Hesitator loop configuration .......................................2-8
Nonrestrictive corners ................................................2-8
Molar strap .....................................................................6-5
Navy end tab ..................................................................6-9
Needle feed machine ....................................................6-20
Needle-nose pliers ........................................................6-11
Needles .........................................................................6-20
Nomenclature .................................................................2-5
Non-continuous line method ........................................7-34
Note pad .........................................................................6-8
Nylon..............................................................................3-2
Office area ....................................................................6-27
Operation ............................................................ 2-19, 6-21
Operational theory .........................................................2-6
Packing .........................................................................5-19
Packing data card ...........................................................6-8
Packing fid .....................................................................6-5
Packing paddle ...............................................................6-5
Parachute loft ...............................................................6-24
Cutting table .............................................................6-27
Harness table and machines .....................................6-27
Metal working area ...................................................6-27
Packing and inspection area .....................................6-25
Work area including layout tables and sewing
machines ...................................................................6-26
Parachute rigger .............................................................1-1
Parachute Rigger Certificates .........................................1-2
Parachute service life .....................................................1-9
Performance standards ...................................................1-5
Pilot chute and bridle .....................................................5-8
Pilot chute and free bag/bridle .....................................5-13
Pilot chute attachment ....................................................7-6
Pilot chute locking rod ...................................................6-6
Pilot chutes ...................................................................2-17
Hand deploy design ..................................................2-17
Spring-loaded design ................................................2-17
Pilot chute threading tool ...............................................6-6
Pilot versus parachute size .............................................1-9
Plastics and synthetics ..................................................3-20
Pony clamps .................................................................6-10
Proper ram-air orientation (PRO) packing .....................4-2
Pull-up cords ..................................................................6-5
Ram-air reserve canopy ...............................................5-13
Ram-air reserve into a sport piggyback system ...........5-28
Ram-air reserve into a two-pin piggyback ...................5-38
Ram-air reserves and sport piggyback systems ...........5-13
Rawhide mallet ............................................................6-13
Record keeping ..............................................................1-7
Removal of bloodstains ................................................7-10
Removal of fresh water ................................................7-10
Removal of mildew ......................................................7-10
Removal of perspiration ...............................................7-10
Removal of petroleum products ...................................7-10
Removal of soil ............................................................7-10
Repair techniques .........................................................7-12
Reserve bag extraction force ........................................4-14
Reserve canopy ..............................................................5-9
Reserve container ...........................................................2-8
Reserve parachute canopy ..............................................2-2
Reserve pilot chute repair—mesh, tackings, and
bad grommet ................................................................7-65
Reserve static line (RSL) systems ................................2-21
Responsibilities of a Certificated Parachute Rigger .......1-5
Rigger’s logbook ............................................................6-8
Rigging and repairs ......................................................5-19
Rigging ethics ................................................................1-9
Ring release housing replacement ...............................7-49
Ripcord ............................................................... 5-12, 5-18
Ripcord pocket Velcro® replacement ...........................7-55
Ripcord pull force ........................................................5-27
Ripcords, cables, and swages .......................................3-24
Intermediate pin ........................................................3-25
Terminal pin .............................................................3-25
Ripstop roller ...............................................................6-11
Round and square canopy—basic patch repair ............7-17
Round canopies and pilot emergency systems ...............5-7
Round canopy into a pilot emergency parachute
system ..........................................................................5-20
Accordion folding the canopy ..................................5-25
Closing the container ................................................5-25
Closing the diaper and stowing the lines ..................5-23
Fold the skirt .............................................................5-22
Layout .......................................................................5-20
Pleating the canopy ..................................................5-21
Skirt or diaper placement .........................................5-24
Round canopy—non-continuous line replacement ......7-30
Round canopy—panel replacement .............................7-21
RSL designs .................................................................2-21
Dual side RSL ..........................................................2-21
Joint Efficiency .........................................................2-24
Fabric ...................................................................2-24
Reinforcing ...........................................................2-25
Stitches per inch ....................................................2-25
Stitch type ..............................................................2-25
Thread tension ......................................................2-25
Thread type ...........................................................2-25
LOR system ..............................................................2-21
Main riser attachment ...............................................2-22
Ripcord cable routing ...............................................2-23
RSL lanyard and container mount ............................2-23
Single-side RSL ........................................................2-21
The collins lanyard/Skyhook™ system .....................2-22
Rubber bands ....................................................... 4-10, 6-8
Safety Stow® ................................................................2-14
Salt water contamination ..............................................7-10
Action .......................................................................7-10
Scalpel or Exacto® knife ................................................6-2
Scissors ..........................................................................6-4
Screwdriver–multi-tip ..................................................6-11
Sealing the parachute ........................................... 1-8, 5-27
Seal press .......................................................................6-7
Seam restitching ...........................................................7-15
Seam ripper ....................................................................6-2
Seam starts .....................................................................7-6
Seam work .....................................................................7-6
Securing the deployment device ..................................2-14
Senior Parachute Rigger ................................................1-2
Sewing machine attachments .......................................6-24
Sewing machines .........................................................6-14
Sewing theory ..............................................................6-18
Oscillating hook .......................................................6-18
Rotary hook ..............................................................6-18
Shot bags ........................................................................6-7
Shoulder strap hook .....................................................6-10
Size “O” rolled rim spur grommet handset ..................6-12
Slider ..............................................................................7-5
Specifications .................................................................3-2
Sport parachute main packing techniques ......................4-2
Spring-loaded pilot chutes ...........................................2-17
Spring scale and fabric testing clamps .........................6-12
Square canopy
Control line replacement ..........................................7-33
Crossport repair ........................................................7-36
Main line replacement ..............................................7-31
Partial panel replacement .........................................7-22
Pilot chute attachment point repair ...........................7-28
Rib repair ..................................................................7-25
Trim check and re-trim .............................................7-37
Stabilizers .......................................................................7-5
Standard harness main lift web replacement ...............7-57
Background ..............................................................7-58
Inspection .................................................................7-62
Procedure ..................................................................7-59
Stealth pilot chute ........................................................2-17
Stimpson Co., Inc. ........................................................6-13
Straightening the canopy ................................................5-7
Suspension lines and connector links ..........................5-10
Tape measure ...............................................................6-10
T-bar positive leverage device .......................................6-6
Technical Standard Order (TSO) ...................................1-8
Temporary locking pins (temp pins) ..............................6-6
Tension board assembly with apex tiedown ................6-12
T-handle bodkin .............................................................6-6
The parachute loft .......................................................6-24
The Safety Stow® ........................................................2-14
The stealth pilot chute .................................................2-17
Thread snips ...................................................................6-3
TSO certification and placard limitations ....................4-14
TSO standards ................................................................2-4
Types of approved data ................................................7-12
Velcro® .........................................................................3-22
Velcro® line protectors ...................................................6-6
Volume .........................................................................4-16
Waxed nylon “supertack” ..............................................6-9
Webbing and tapes .........................................................3-3
Webbing selection ..........................................................3-4
Needle weave .............................................................3-4
Shuttle weave .............................................................3-4
